Bathroom drywall/mud is DONE and fully primed!

Huge milestone!

Two Sundays in a row, we've been priming the drywall.  We put two coats of white primer on everything, and it looks FANTASTIC.  Our neighbor Brian did an amazing mud job and it looks incredible.  Finally, the upstairs bathroom and hallway are ready for color paint!

There's still plenty to do, however.  We'll need to install shower fixtures, cement board/waterproofing, granite tile, radient heat, ceramic floor tile, bamboo floor in hallway, window & door trim, baseboard moulding.  WOW.  The fact that I can list almost all that's left in one short sentence really speaks to how far we've come in 4 years of building this bathroom.  Huzzah!

Bella approves of the first coat, even though she prefers black.
Bella approves of the first coat, even though she prefers black.
washer cupboard
washer cupboard
Hallway facing bedroom/bathroom
Hallway facing bedroom/bathroom
bath, facing sink cubby (this got another coat a week later)
bath, facing sink cubby (this got another coat a week later)
bath, facing toilet (this got another coat a week later)
bath, facing toilet (this got another coat a week later)
bath, above toilet (this got another coat a week later)
bath, above toilet (this got another coat a week later)

 

Comment

The content of this field is kept private and will not be shown publicly.
CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.
To prevent automated spam submissions leave this field empty.

HouseBlogs.net

Powered by Pressflow, an open source content management system